According to the monitoring report publicized on an environmental platform on 7 Apr., Heilongjiang Longfeng Corn Development Co., Ltd. (Dragon Phoenix) has completed starch sugar deep processing project.
Project overview
- Nature: Expansion and Reconstruction
- Location: Within Dragon Phoenix’s plant, Qinggang County, Suihua City, Heilongjiang Province
- Total investment: USD7.66 million (RMB 55 million), of which USD0.17 million (RMB 1.2 million) is for environmental protection
- Construction content: The project utilizes the existing sodium gluconate production line, adding ion-exchange systems, saccharification tanks, plate and frame filters, evaporators, and other auxiliary equipment to produce starch sugar (the starch sugar production line operates 350 days a year, while sodium gluconate production is halted). It also adds equipment to the existing erythritol production line for valine production. Product plan: 100,000 t/a of maltose (meeting GB/T20883-2017 standards) produced from 148,600 t/a of self-produced starch slurry 20,000 t/a of valine produced from 25,400 t/a of self-produced glucose
- Labor: No new personnel, relying on existing staff
- Timeline:
- Approval of EI report: 24 Apr., 2024
- Starting construction: May 2024
- Completion: Early Feb. 2025
- Starting commissioning: Late Feb. 2025
- On-site environmental monitoring: 4-5 March, 2025, and 18-19 March, 2025
Dragon Phoenix, controlled by Zhucheng Xingmao Corn Development Co., Ltd., currently processes 1.5 million t/a of corn to produce 1.3 million t/a of starch, 20,000 t/a of erythritol, 100,000 t/a of maltose, 100,000 t/a of glucose syrup, 30,000 t/a of maltodextrin, 170,000 t/a of sprayed corn bran, 86,200 t/a of protein powder, 12,000 t/a of crude oil, and 57,000 t/a of germ.
Follow our LinkedIn to get more industry updates.